Can it Be Built?
Can it be built?
While important, there’s more to OR ceiling layouts than compliance.  Our Applications Engineers regularly see compliant designs that can’t be built economically as drawn, if at all.  They frequently spot problems that might otherwise result in:
1. Complicated ceilings that add cost with no value to the owner.
2. High operating costs with no payback; costs related to energy consumption, housekeeping, owner risk and more.
3 Substantial construction problems that could delay owner revenue.
4. Interstitial pathways through which dangerous contaminants might otherwise be drawn into an OR directly over a surgical patient, putting them at risk.
We put our expertise to work for you, taking the time to layout ceilings that can be built economically while meeting the needs for each unique space within the demands of your project schedule.